Mainframe Modernization for P&C Insurance — Ticvic Case Study
Case Studies / Insurance
Insurance · Mainframe

The 6-hour mainframe job that now finishes in under two.

Parallelizing a single-threaded VSAM mass-copy on z/OS — without replacing a single mainframe component.

70%
Faster processing
40%
Lower MIPS
$300k/yr
Saved
The ClientA leading US Property & Casualty insurer running core policy systems on IBM z/OS.
01

The Challenge

The production-to-test policy copy ran 6–8 hours, single-threaded — while MIPS costs climbed and QA waited.

✕6–8 hour copy window delayed every test refresh
✕Excessive MIPS consumption drove rising 2024 costs
✕SLA risk on downstream QA and release cycles
02

What We Built

A split-and-parallelize redesign of the copy pipeline — piloted on 10,000 records before full rollout, delivered in four months.

✓Easytrieve partitioning of input policy datasets into 25 files
✓25 parallel SYNCSORT copy jobs, merged into consolidated VSAM
✓JCL optimization and CA7 scheduling integration
03

The Stack

COBOLJCLEasytrieveREXXVSAMDB2IMS DBSYNCSORTCA7FILE-AID
04

The Results

Numbers from production operation — not projections.

70%
Faster copy (6–8 hrs → under 2)
40%
MIPS reduction
$300k
Saved annually
30%
Faster QA cycles (5 days → 3.5)